Details
Built
2003–07
Capacity
60000 (olympics)
Construction cost
R$380 million (US$192 million)
Field size
105 m × 68 m (344 ft × 223 ft)
Height
70m
Opened
2016
Operator
Botafogo
Owner
Prefecture of Rio de Janeiro
Public transit
SuperVia
Surface
Grass
Team
Botafogo (Série A) (2007–)
Opening hours
- WednesdayClosed
- ThursdayClosed
- FridayClosed
- SaturdayClosed
- SundayClosed
- MondayClosed
- TuesdayClosed